Projects · Public works · 2024
Tunnel paving on the Xanthi – Dimario road
Production, haulage and laying of asphalt on a mountain road with successive tunnels, leading to the Dimario border crossing.
Projects · Public works · 2024
Production, haulage and laying of asphalt on a mountain road with successive tunnels, leading to the Dimario border crossing.
One of the most demanding road projects in the region: consecutive tunnels, steep gradients and winter conditions — all for a safe, durable road surface for years to come.
VUGIUKLI SA undertook the production and laying of the asphalt courses on a section of the vertical axis leading to Dimario. Most of the work took place inside tunnels, where limited space, ventilation and lighting call for flawless coordination between crews and machinery.
A steady flow of material from our own plant, combined with strict temperature monitoring during haulage, ensured consistent quality in every course.
01
Our truck fleet kept the paver supplied without interruption, so the asphalt was laid at the right temperature and work never had to stop. Planning the runs over a mountain road network was key to the quality of the final result.
02
In a tunnel, every move is calculated. Our crews worked with dedicated lighting and signage, keeping personnel safe and staying within the strict tolerances set by the project specifications.
03
Final compaction with tandem rollers and careful manual work at joints and edges result in a smooth, watertight and hard-wearing road surface.
From producing the materials to laying the final course, we are by your side at every stage.