Resurfacing on the Egnatia Motorway
New asphalt courses on a section of the motorway, carried out under live traffic, to tight schedules and high quality standards.
Projects · Public works · 2025
New asphalt courses on a section of the motorway, carried out under live traffic, to tight schedules and high quality standards.
On one of the country’s most important road corridors, every working hour counts. The project was delivered in phases so that traffic could keep moving safely.
The company carried out the rehabilitation of the road surface on a section of the Egnatia Motorway in the middle of summer, in high temperatures. With modern paving equipment, rollers and our own truck fleet, the works progressed quickly and with consistent quality.
The asphalt was produced at our plant, with laboratory testing of every batch and temperatures logged from loading to laying.
01
Temporary signage, well-organised crews and precise scheduling allowed the works to proceed without interrupting motorway operations. The safety of drivers and staff was the priority at every stage.
02
VUGIUKLI SA pavers, rollers and trucks, operated by experienced crews, deliver an even layer thickness and proper compaction — the two keys to a pavement that stands up to heavy loads.
03
The company’s vertically integrated set-up — aggregate production, asphalt production, haulage and laying — gives us full control over quality and speed of delivery.
From producing the materials to laying the final course, we are by your side at every stage.